Service of Audi A4 from 2001 to 2005 release.
1. Operation and maintenance of the car
2. Engine
2.1. General information
2.2. Predvaritlny checks
2.3. Mekhanichsky part (petrol engines 2,0l)
2.4. Lubrication system
2.5. Cooling system
2.6. System of injection
2.6.1. Removal and installation of a turbocharger
2.6.2. Removal and installation of the vacuum block of a turbocharger
2.6.3. Adjustment of the vacuum block of a turbocharger (the turbocharger is removed)
2.6.4. The general instructions on self-diagnostics of system of injection
2.6.5. Decrease in high pressure of fuel
2.6.6. Removal and installation of a flowmeter of air
2.6.7. Removal and installation of an inlet collector with a fuel stage
2.6.8. Removal and installation of a fuel stage (Rail)
2.6.9. Removal and installation of nozzles
2.6.10. Check of pressure of fuel and residual pressure in front of the pump of high pressure
2.6.11. Check of residual pressure
2.6.12. Removal and installation of the pump of high pressure
2.6.13. Replacement of the control unit of the engine
2.6.14. Removal and installation a lambda probe in front of the catalyst
2.6.15. Removal and installation a lambda probe after the catalyst
2.6.16. The fuel tank (front-wheel cars – all models with MPI engines and 2,0 l of FSI)
2.6.17. Pumping of fuel from a tank
2.6.18. Removal and installation of the fuel tank with hinged details
2.6.19. Electric check of the fuel pump
2.6.20. Check of amount of the fuel given by the fuel pump (cars from the 4th the cylinder engine with a free admission)
2.6.21. Check of amount of the fuel given by the fuel pump (atomobil with the engine of 1,8 l Turbo)
2.6.22. Check of amount of the fuel given by the fuel pump (atomobil from the 4th the cylinder FSI engine)
2.6.23. Check of amount of the fuel given by the fuel pump (cars from 6 the cylinder MPI engine)
2.6.24. Removal and installation of knot of supply of fuel
2.6.25. Fuel tank (all-wheel drive cars till 10:04)
2.6.26. Pumping of fuel from a tank
2.6.27. Removal and installation of knot of a pedal of an accelerator with sensors of provision of a pedal
2.7. System of production of the fulfilled gases
2.8. Mechanical part (petrol engines 3,0; 3,2 l)
2.9. Mechanical part (petrol engines of 4,2 l)
2.10. Mechanical part (diesel engines of 2,0 l)
2.11. Tables
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Schemes of electric equipment
 







2-6-3-regulirovka-vakuumnogo-bloka-turbonagnetatelya-turbonagnetatel-snyat.html

2.6.3. Adjustment of the vacuum block of a turbocharger (the turbocharger is removed)

Adjustment

Fig. 2.222. Hose of the vacuum block


Remove a hose from the vacuum block on a turbocharger (fig. 2.222).

Fig. 2.220. Lock plate of the lever of a turbocharger


Remove a lock plate 1 via the lever of a turbocharger (fig. 2.220).

Fig. 2.221. A draft detachment from a turbocharger


Weaken a lock-nut of 2 (fig. 2.221).

Fig. 2.223. Adjusting nut of the bypass valve


Previously adjust bypass the valve 1 corrugated nut so that the valve was hardly scrolled by hand (fig. 2.223).
By hand twirl a lock-nut.

Fig. 2.224. Installation of the manual vacuum pump


Connect the manual vacuum pump, a turbocharger tester to the socket II and the reducing valve, as shown in the figure 2.224.
Close the reducing valve the lever 1.
Establish a mobile ring of 1 manual vacuum pump in situation B for "pressure" (fig. 2.225).

Fig. 2.225. Installation of a mobile ring of the vacuum pump


To include a tester of a turbocharger and install the mobile switch in situation II.

Fig. 2.226. Fixing of the indicator of hour type on a turbocharger


Fix a universal support of the indicator of hour type on a turbocharger (fig. 2.226).

NOTE
Data in mm belong to an only a few indicator (contains 1 mm of preliminary shift).

Fix the indicator of hour type with the extender of 30 mm and the flat probe on a universal support of the indicator of hour type.
Install with a pressure of 0 bars the indicator of hour type on a preliminary tightness in 1 mm.
Turn the index of the indicator of hour type in situation 0.
Check ease of the course of the indicator.
Set the manual vacuum pump in motion until on a tester of a turbocharger value of pressure of 350 ±5 Mbar appears.
The indicator of hour type has to show from 4,1 to 4,3 mm, otherwise follows rotate a corrugated nut until this value is reached.
By hand twirl a lock-nut.
Repeat measurement.
Dump pressure via the reducing valve to 0 Mbar.
Install the indicator of hour type in situation 0.

NOTE
The subsequent measurements have to be executed in the specified sequence. Pressure at measurements cannot be lowered to 0.

Set the manual vacuum pump in motion until on a tester of a turbocharger value of pressure of 350 ±5 Mbar appears.
Consider an indicator on the indicator and write down it.
Set the manual vacuum pump in motion until on a tester of a turbocharger value of pressure of 650-700 Mbar appears.
Dump pressure via the reducing valve to 350 ±5 Mbar.
Consider an indicator on the indicator and write down it.
Put indicators 1 and 2 and to divide the sum on 2.
The result (average value) has to make 5 ±0,25 mm.
If as a result average value is not equal to 5 ±0,25 mm, follows modify adjustment, tighten a lock-nut by hand and repeat measurement.
If average value is equal to 5 ±0,25 mm, tighten a lock-nut and record it the fixing varnish.
Fix a lock plate 1 over the lever of the vacuum block (fig. 2.220).