Service of Audi A4 from 2001 to 2005 release.
1. Operation and maintenance of the car
2. Engine
2.1. General information
2.2. Predvaritlny checks
2.3. Mekhanichsky part (petrol engines 2,0l)
2.4. Lubrication system
2.5. Cooling system
2.6. System of injection
2.6.1. Removal and installation of a turbocharger
2.6.2. Removal and installation of the vacuum block of a turbocharger
2.6.3. Adjustment of the vacuum block of a turbocharger (the turbocharger is removed)
2.6.4. The general instructions on self-diagnostics of system of injection
2.6.5. Decrease in high pressure of fuel
2.6.6. Removal and installation of a flowmeter of air
2.6.7. Removal and installation of an inlet collector with a fuel stage
2.6.8. Removal and installation of a fuel stage (Rail)
2.6.9. Removal and installation of nozzles
2.6.10. Check of pressure of fuel and residual pressure in front of the pump of high pressure
2.6.11. Check of residual pressure
2.6.12. Removal and installation of the pump of high pressure
2.6.13. Replacement of the control unit of the engine
2.6.14. Removal and installation a lambda probe in front of the catalyst
2.6.15. Removal and installation a lambda probe after the catalyst
2.6.16. The fuel tank (front-wheel cars – all models with MPI engines and 2,0 l of FSI)
2.6.17. Pumping of fuel from a tank
2.6.18. Removal and installation of the fuel tank with hinged details
2.6.19. Electric check of the fuel pump
2.6.20. Check of amount of the fuel given by the fuel pump (cars from the 4th the cylinder engine with a free admission)
2.6.21. Check of amount of the fuel given by the fuel pump (atomobil with the engine of 1,8 l Turbo)
2.6.22. Check of amount of the fuel given by the fuel pump (atomobil from the 4th the cylinder FSI engine)
2.6.23. Check of amount of the fuel given by the fuel pump (cars from 6 the cylinder MPI engine)
2.6.24. Removal and installation of knot of supply of fuel
2.6.25. Fuel tank (all-wheel drive cars till 10:04)
2.6.26. Pumping of fuel from a tank
2.6.27. Removal and installation of knot of a pedal of an accelerator with sensors of provision of a pedal
2.7. System of production of the fulfilled gases
2.8. Mechanical part (petrol engines 3,0; 3,2 l)
2.9. Mechanical part (petrol engines of 4,2 l)
2.10. Mechanical part (diesel engines of 2,0 l)
2.11. Tables
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Schemes of electric equipment
 







2-6-13-zamena-bloka-upravleniya-dvigatelya.html

2.6.13. Replacement of the control unit of the engine

NOTE
At a rassoyedineniye of sockets of the control unit of the engine from memory the programmed values are removed, contents of memory of malfunctions remain.

Removal
Connect a diagnostic complex and set the automobile system "01-Motor-steuergeraet/engine Control unit" in the field of the choice. Ignition has to be included at the same time.

Fig. 2.245. Identification data and coding of control units


On the display of a diagnostic complex identification data and the coding of control units (fig. 2.245) will be displayed.
At first it is necessary to study attentively identification data of control units and to unpack them.
Switch off ignition.
Extend rubber laying of a cover of the water taking away box in the direction specified by an arrow.

Fig. 2.246. A casing of the water taking away box


Remove a casing of the water taking away box 1 (fig. 2.246) forward.
Hook the screw-driver and remove both protective caps 3.
Turn off six-sided nuts 4 on several turns.

Fig. 2.247. Removal of levers of a screen wiper


Having slightly inclined, release levers 2 screen wipers from an axis of a screen wiper (fig. 2.247).
Completely unscrew six-sided nuts and remove screen wiper levers.
Pull together safety clip-on earrings 1 and remove the deflector 5 (fig. 2.247).

Fig. 2.74. Cover of the switching block


Uncover an electrobox on the water taking away box, unscrew screws (fig. 2.74).

Fig. 2.75. Fixing of levers


Carefully raise a fixing collar (fig. 2.75) by means of the screw-driver.

Fig. 2.248. Control unit components


To complicate access to sockets on the engine control unit, this block 1 is fastened by means of a clamp of 2 and srezny screws 3 and 4 to the metal case 5 (fig. 2.248).

ATTENTION
In order to avoid damage (combustion) of shtekerny connections and connections of wires, isolation and control units it is necessary strictly observe the given sequence of works.

The carving of both srezny screws 4 (which are fastened not to the engine control unit) is covered with a clamp. therefore for twisting of both screws it is necessary to warm up their carving the industrial hair dryer (fig. 2.248).
The carving of both srezny screws 3 (which are fastened to the engine control unit) is not covered with a clamp. A carving in the case of the control unit it is not allowed and, besides, it is not required to warm up (inadmissible heating of the control unit of the engine).

Fig. 2.249. Adjustment of the industrial hair dryer


Adjust the industrial hair dryer as it is shown in the figure 2.249.
It means that the potentiometer of the regulator of temperature 2 has to be established on the maximum heating, and the two-level switch of intensity of an obduv 3 – in situation 3.

NOTE
Then heat srezny screws the industrial hair dryer. Thanks to it the braking action of a clamp on a carving of srezny screws stops, and lock screws can be unscrewed, using less efforts.

Cover all painted surfaces to prevent damages from the industrial hair dryer or tightening grips.

ATTENTION
Because of heating of srezny screws parts of the protection cover strongly heat up. Do not burn. It is necessary also you watch that only lock screws, but not nearby components whenever possible heated up. If necessary it is necessary to cover them.

Direct a nozzle of the industrial hair dryer on srezny the clamp screw.
Turn on the industrial hair dryer and heat the screw about 20-25 pages.

Fig. 2.250. Twisting of the screw


Then take tightening pincers a screw head and unscrew its (fig. 2.250).
Actions when untwisting the second screw similar.
Both srezny screws which are fastened to the engine control unit should not be warmed up. They should be unscrewed without heating.
After that it is possible to separate the control unit of the engine and the protection cover.

Fig. 2.251. Connecting sockets of the control unit of the engine


Release shtekerny latches and remove connecting sockets 1 and 2 from the control unit of the engine (fig. 2.251).
Take the old control unit of the engine and insert new.

Installation
Installation is carried out in the return sequence. Surely install the protection cover of the control unit of the engine. Use new srezny screws.
After installation of the new control unit of the engine it is necessary to perform the following works.
To activate the engine control unit in "The conducted search of malfunctions" during the "Motorsteuergeraet ersetzen (replace the engine control unit)" check / function.


2.6.12. Removal and installation of the pump of high pressure

2.6.14. Removal and installation a lambda probe in front of the catalyst