Service of Audi A4 from 2001 to 2005 release.
1. Operation and maintenance of the car
2. Engine
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
7.1. General information
7.2. Power supply system
7.2.1. Rechargeable battery
7.2.2. Shutdown and connection of the rechargeable battery in a motor compartment
7.2.3. Shutdown and connection of the rechargeable battery in a luggage carrier
7.2.4. Removal and installation of the rechargeable battery in a motor compartment
7.2.5. Removal and installation of the rechargeable battery in a luggage carrier
7.2.6. Check of reliability of fastening of joint stock bank
7.2.7. Accumulators with "a magic eye"
7.2.8. Rest voltage measurement
7.2.9. Check of level of electrolyte – joint stock bank with traffic jams
7.2.10. Check of density of electrolyte in all sections – joint stock bank with traffic jams
7.2.11. Voltage measurement under loading
7.2.12. Charging of the rechargeable battery
7.2.13. Strongly discharged joint stock banks
7.2.14. Bystry accumulator charging
7.3. Generator
7.4. Starter
7.5. Relay blocks, sockets and safety locks
8. Body
9. Schemes of electric equipment
 







7-2-1-akkumulyatornaya-batareya.html

7.2.1. Rechargeable battery

NOTE
It is forbidden to grease conclusions of the rechargeable battery in addition.
Polar plugs of joint stock bank are allowed to be got only a hand, without effort, in order to avoid damages of the case of joint stock bank.

Indications for the address with joint stock bank

Fig. 7.1. Plug of the rechargeable battery



The moment of an inhaling of plugs of the accumulator makes 7,5 N · m.
The moment of an inhaling of additional clips to polar plugs of joint stock bank makes 7,5 N · m.


7.2. Power supply system

7.2.2. Shutdown and connection of the rechargeable battery in a motor compartment